Thursday, May 31, 2012

Preparing for Net Posts

As part of the construction, the concrete supports for the net posts are being replaced.  The posts are being removed along with the old cement bases.  The new foundations begin with removing 4 feet of material from the subfloor.  Steel and PVC pipe is set in the concrete as for a sleeve for the new net posts.




0 comments:

Post a Comment