Photobucket

Welcome to the Willow Oaks Tennis Blog

This Blog will follow the renovation of the indoor tennis courts between May 2012 and completion.

Photobucket

How to Use the Slider

Click on the Title of Each Slide to link you to the related article.

Photobucket

Welcome to the Willow Oaks Tennis Blog

Click on the title of this slide to take you to our first blog post.

Photobucket

Renovation Begins

Click on the title of this slide "Renovation Begins" to link to the related blog post.

Wednesday, May 23, 2012

Cross section of the old clay surface

Above is a photo of a cross section of the top layer of the old courts.   You can see over time that the clay surface had become compacted, making it difficult to maintain consistent conditions.

Tuesday, May 22, 2012

Renovation Begins

Renovation to the indoor tennis courts at Willow Oaks began on Monday, May 21 bright and early. The first stage of the project is the removal of the court material and the plastic piping from the old underground watering system. Hundreds of tons of clay and gravel is being removed in order to reach the original floor level when the building was constructed. In excavation about 12-14 inches of material will be taken from the court surface. This stage of the process will take about 7-10 days.