Monday, June 4, 2012

Building a New Base

During the excavation, 15 to 16 inches of material was removed from the entire court surface. From there, the ground was leveled using a small construction grader. A layer of stone 4 inches deep will be spread and compacted throughout the building to provide a  strong base for the new courts.